Offices Cat A Fitout, Manchester

Strip out of office space to the full floor of a hi-rise block and return to a Category A status.

The client employed us to remove the fully fitted out floor and return to an empty shell with only having the access to the central core which included the lift and WC's. This open plan space would then be ready to re-let to a tenant to fit out. 

The works inlcuded full strip out, making good the perimeter walls and decoration. Mechanical, electrical and data works were stripped back and made to suit the open plan area.

Given this was in a city centre location, the logistics were tricky but executed well.